Hunter-Johnson Associates Electrical Building  and Environmental Engineering Specialists

Hunter Johnson Associates
Portfolio of recent contracts.

image of wentworth castle - contract by Hunter Johnson
wentworth castle

image of the round house derby - contract by Hunter Johnson
round hse. derby

image of ekat city russia - contract by Hunter Johnson
ekat city russia

image of licensed vituallers hall ascot - contract by Hunter Johnson
lic.victualler ascot

image of hess university of york - contract by Hunter Johnson
hess uni. of york

image of signhill junior school - contract by Hunter Johnson
signhill jnr. school

image of city hall sheffield - contract by Hunter Johnson
city hall sheffield

image of dearne theatre - contract by Hunter Johnson
dearne theatre

image of yedl/nedl - contract by Hunter Johnson
yedl/nedl

image of herc university of york - contract by Hunter Johnson
herc-uni. of york

image of corby pool corby - contract by Hunter Johnson
corby pool

 

Textual Only - click to read

Schools Amalgamations – NELC

Schools Kitchens – NELC

Blood Centre - Sheffield

Transport Bus Interchange

Orchard Square Shopping Centre

Wathhorn Church - Derby

Roydon Mariana

McAuley Schools – Doncaster

Sheffield Hallam University

Sheffield Hallam Teaching Hospital

The Hub - Birmingham

Gipsy Lane

Borrow Wood School - Derby

Various utilizes studies

We welcome your enquiry.

Hunter Johnson Assoc. Electrical & Mechanical Building Service Engineers & Consultants

Download a pdf guide of projects undertaken

image of signhill school - contract by Hunter Johnson image of wentworth castle - contract by Hunter Johnson image of city hsll sheffield - contract by Hunter Johnson image of hess university of york - contract by Hunter Johnson image of dearne theatre - contract by Hunter Johnson image of the round house - contract by Hunter Johnson image of licensed vituallers hall ascot - contract by Hunter Johnson image of ekat city russia - contract by Hunter Johnson image of yedl/nedl - contract by Hunter Johnson image of herc university of yorl - contract by Hunter Johnson image of corby pool corby - contract by Hunter Johnson filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available filler image which is blank as no image available

Presented Projects:

Some of the projects listed here were undertaken as Hunter Johnson Associates.

Some were undertaken as a freelance engineer for Arup / WYG & Balfour Beatty.

These projects were completed with the same high degree of professionalism and care as Hunter-Johnson commits to all their projects.

contact us with your enquiry or
download a pdf projects list

Signhills Junior School - New Hall.

Engineering Services for local authority to take project from conception to completion for the creation of a new hall.

The more important features of the project were to utilize new technologies to provide the space and desires of the school.

Wentworth Castle & Stainborough Park.

Services Engineer for the Heritage Lottery Fund Stage 2 application through to tender for the restoration of various structures, including monuments, the Estate Church and the Estate House.

This was part of the restoration of the estate historic parklands and lakes as featured on BBC2 restoration program.

Sheffield City Hall.

Engineer responsible for the creation of Tender Documentation for a 12.5 million pound refurbishment of the existing grade 1 & grade 2 listed building, after which, was novated to work as the detailed designer for the Contractor.

Hesslington East – University of York

Electrical Engineer working with the Architects and client through RIBA stage C and D. The project value is in excess of £100m, and is for the creation of a new University campus.

Dearne Community Theatre – South Yorkshire

Engineer responsible for the creation of tender performance specification on an existing grade 2* building of great importance to the local community.

Round House - Derby

Engineer responsible for the creation of tender performance specification of revamp of existing train depo into a new college, total project value of circa 50million pounds.

The Society of Licensed Victuallers – Ascot

Project engineer for the design of a 2.3 million pound new build school resources centre, started at RIBA stage D, detailed design, then site duties though to completion and year defects.

Ekat City – Russia

Working with a Parisian Architect on a Russian projection with a total value in excess of 1.5 billion dollars

YEDL/NEDL

Worked with YEDL to produce a standard, detailed design for all the electrical systems within existing and new sub-stations.

HERC – University of York

Created performance specification, then worked for the Contractor completing the design including value engineering the project. The project value circa 7 million pounds.

Corby Pool - Corby

Engineer responsible for the creation of tender performance specification for a new Olympic swimming pool with a project value of circa 12 million pounds.

Wathhorn Church - Derby

Electrical Engineer responsible for the design of the retained main church area along with the design of the new adjoin foyer and main hall area.

Roydon Mariana

Carried out the Electrical Design for the Contractor on a design and build basis.

McAuley Schools – Doncaster Metropolitan Council

Electrical Engineer responsible a new fire alarm design, new catering faculty and new mains electrical upgrades, this included initial site survey, detailed design and site supervision.

Sheffield Hallam University

Electrical Engineer responsible for the creation of tender performance specification for a new catering facility.

Sheffield Hallam Teaching Hospital

Electrical Engineer responsible for the initial site survey, creation of Tender documentation, tender appraisal and site duties for the new anesthetic faculty.

Various Utilizes Studies and Capacity Investigations

Performed utilities studies on many sizes of mixed developments, including diversions and capacity cost investigations.

The Hub - Birmingham

Worked for a contractor and competitively tendered for the works, and produced the construction design information.

Gipsy Lane

Electrical Engineer responsible for the creation of design and installation drawings for a range of speculative offices.

Borrow Wood School – Derby City Council

Surveyed an existing city council school, produced tender documentation, approved tender and worked with the contractor to deliver the works within a short time period.

Schools Kitchens – NELC

Engineering Services for local authority to produce a feasibility study to ascertain the services implications for introducing hot meals back into 52 primary schools within the local authority. Following on, engineer to design and oversee the works.

Schools Amalgamations

Engineering Services for local authority to take the projects from conception to completion, for several schools within the North East Lincolnshire Authority.

Blood Centre – Sheffield

Engineer for a 1million pound refurbishment of the existing blood centre laboratories. Carried out original performance specification and detailed design, overseeing the job on site to completion.

South Yorkshire Transport Bus Interchange

Engineer responsible for performance specification for the production of an energy saving strategy for all the sites throughout South Yorkshire.

Orchard Square Shopping Centre – Sheffield City Centre

Engineer responsible for the creation of Tender Documentation for the refurbishment of the existing shops and other facilities. Following the job through to construction.

 

 